PROJECT REFERENCES
Location | Scope of Work |
Park Hotel, Bideford Road | Driven Micropile – Foundation Strengthening Works |
Covered Walkway, Ang Mo Kio Ave 3 | Driven Micropile – Piling Foundation Works |
Orchard Paragon Shopping Centre | Driven Micropile – Foundation Strengthening Works |
Pier C & D, Terminal 1, Changi Airport | Bored Micropile – Upgrading Works |
C64A Chai Chee (LUP) | Bored Micropile – Lift Upgrading Works |
Victoria Concert Hall | Bored Micropile – Conservation Works |
Meadows & Pierce Condominium | Jack-In Pile – Foundation Works |
Greenwood Mews Cluster Houses | Jack-In Pile – Foundation Works |
Sports Hall, Saint Joseph’s Institution | Jack-In Pile – Foundation Works |
Keppel Shipyard, Benoi Road | Ground Support Works – Retaining Wall |
Marymount MRT Station | Ground Support Works – Deep Foundation Tension Anchorage |
Sentosa Cove | Ground Support Works – Soil Nail for Slope Protection |
Pier C & D, Terminal 1, Changi Airport | Underpinning Preloading – Upgrading Works |
C64A Chai Chee (LUP) | Underpinning Preloading – Lift Upgrading Works |
Victoria Concert Hall | Underpinning Preloading – Conservation Works |
Jervois Road Condominium | Carbon Strip – Beam Strengthening Works |
Grand Hyatt Singapore | Carbon Strip – Beam & Slab Strengthening Works |
Oriental Hotel Sinapore | Carbon Strip – Slab Strengthening Works |
Woodlands Driving Centre | Enlargement – Structural Strengthening Works |
Grand Hyatt Singapore | Enlargement – Structural Strengthening Works |
Singapore Polytechnic | Enlargement – Structural Strengthening Works |
Adelphi, Coleman Street | Fiber Wrapping – Structural Strengthening Works |
Loyang Secondary School | Fiber Wrapping – Column Strengthening Works |
HDB, Kim Keat & Whampoa | Fiber Wrapping – Column Strengthening Works |
Shell, Pulau Bukom | Structural Repair Works |
Prima Silo | Structural Repair Works |
JTC, Woodlands Spectrum I | Structural Repair Works |
Grand Hyatt Singapore | Steel Plate Bonding – Structural Strengthening Works |
Jervois Road Condominium | Steel Plate Bonding – Beam Strengthening Works |
HDB, G5B, G8A, G9C, G9F (LUP) | Soil Investigation Works – Lift Upgrading |
Flo Residences Condominium, Punggol | Soil Investigation Works |
PVA / PVB Resin Plant, Jurong Island | Soil Investigation Works |
Capella Singapore, Sentosa | Geotechnical Instrumentation |
Kerrisdale Condominium | Geotechnical Instrumentation |
The Fernhill Condominium | Geotechnical Instrumentation |
Offshore Landfill Project, Pulau Semakau | Foundation Testing |
International Cruise Terminal | Foundation Testing |
Pasir Panjang Terminal (Phase C6-10, P12-18) | Foundation Testing |